Справочник Пользователя для Graco 257100

Скачать
Страница из 32
Storage 
14
3A0245B
Storage
1.
Perform Pressure Relief Procedure, page 6 (prime 
valve handle in down position). Leave prime valve 
handle in PRESSURE RELIEF position.
2.
Spray water mist on top of any remaining material in 
the hopper and cover hopper with lid.
3.
Cover valve and tool ends to keep joint compound 
from hardening.
4.
Submerge deflector of prime hose in bucket or cover 
to keep join compound from hardening. 
Cleanup
1.
Perform Pressure Relief Procedure, page 6 (prime 
valve handle in down position).
2.
Flush unused material from hopper, hose, and 
prime hose.
3.
Remove remaining material from hopper.
4.
Turn pump control fully counter-clockwise to shut 
pump off.
5.
Fill material hopper with water and run pump to 
flush unit. Run water through material hose, tools 
and drain line thoroughly flush system. 
6.
Clean all tools.
7.
Remove drain plug from hopper. Flush with water. 
Clean and install drain plug.
NOTICE
Do not use with quick-set materials. They can harden 
inside the unit and hose.
bar/psi
ti15614a
ti8794a
ti14877a
ti8793a
ti11670a
ti14879a