Справочник Пользователя для Jacuzzi F258000

Скачать
Страница из 24
FIXED PANEL
BOTTOM RAIL
LAY A 1/4" BEAD OF
SEALANT UNDER THE
FIXED PANEL
TWO
SCREWS
15
°
ILLUSTRATION 14
ILLUSTRATION 12
ILLUSTRATION 13
S
R
15
°
1/8"
IMPORTANT:
MUST DRILL AT A 15
°
ANGLE TO AVOID
DRILLING THROUGH
DOOR GUIDE AREA.
IMPORTANT:
MUST DRILL AT A 15
°
ANGLE TO AVOID
DRILLING THROUGH
SIDE OF RAIL.
M3.5X9.5MM
STAINLESS STEEL
SCREW
QTY.-1
S
FIXED PANEL TO BOTTOM RAIL
DRILLING FIXED PANEL
DRILLING FIXED PANEL
DOOR GUIDE
AREA
OU
TS
IDE
M4.2X19MM
STAINLESS STEEL
SCREW
QTY.-2
R
10. Locate the bottom rail and the fixed panel.  Lay a
bead of sealant on the bottom of the fixed panel.
Secure the bottom rail to the fixed panel.  (See
Illustration 12.)  Drill a 3/32" diameter hole into the
bottom rail at a 15
°
 angle.  Drill only through the first
aluminum thickness.  (See Illustration 13.)  Secure
the front of the fixed panel to the bottom rail.  (See
Illustration 14.)  Clean off excess sealant.
13