Справочник Пользователя для Conair UGE014/0999

Скачать
Страница из 38
To replace an end gasket:
Remove the retaining rings.
Loosen the wing nuts
and lift off the ring that holds the gasket in place. 
Remove the damaged gasket and slide a new
gasket over the studs.
No sealant is required.
Reassemble. 
Slip the retaining ring over the studs to
cover the gasket. Tighten the wing nuts.
R
EPLACING
G
ASKETS
UGE014/0999
Water/Spray Tanks
M
AINTENANCE
5-3
3
2
1
Normal operation of the WT/ST tank creates many wet sur-
faces.  We recommend generous monthly lubrication of any
threaded or sliding components involved in positioning the
tank.  Those components include the positioning mechanisms
such as the up/down vertical support shafts, side-to-side cross
thread, and the linear actuator.  You may need to lubricate
more often than monthly.
Lubricate the vertical support shaft  and
grease fittings.  
Apply bearing compound to the fit-
tings until it overflows.  Apply a coating of the compound
to the shafts as well.
Lubricate the side-to-side cross thread grease 
fittings.  
Apply bearing compound to the fittings until it
overflows.  Apply a coating of the compound to the
thread as well.
Lubricate the linear actuator according to
manufacturer’s instructions. 
L
UBRICATING
THE
T
ANK
C
OMPONENTS
Tools required:
❒ grease gun
❒ seize-resistant
bearing 
compound
1
2
3
C
LEANING THE
T
ANK AND
S
PRAY
B
ARS
The tank, spray bars and optional recirculation reservoir
should be thoroughly to remove particles that can accumulate.
Drain the tank and reservoir.  
Wipe surfaces thoroughly 
to remove particles. 
Remove the spray bars.  
Twist each spray bar coun-
terclockwise and pull it out.
Clean the spray bars.  
Flush each bar with a 
compressed air line or water hose.  Use a soft brush 
to remove any particles clogging the small holes. 
Reassemble by repeating the steps in reverse
order.
1
2
3
4
5