Справочник Пользователя для Lucent Technologies Release 6

Скачать
Страница из 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Install Telecommunications Cabling 
Page 2-14
Install Sneak Fuse Panels 
2
Figure 2-7.
Model 507B Sneak Fuse Panel
1. Locate the 507B near the network interface or the MDF.
2. Hold the panel against the mounting surface and mark the mounting 
screw locations. Drill pilot holes at the marked locations and partially 
install a locally obtained #12 x 3/4-inch screw into the 2 bottom mounting 
slots.
3. Slide the sneak fuse panel onto the mounting screws and tighten the 
screws securely.
4. Install a locally obtained #12 x 3/4-inch screw into the top 2 mounting slots 
and tighten securely.
5. Repeat the procedure for each sneak fuse panel.
Figure Notes:
1. Sneak Fuse Panel
2. 25-Pair Male Connector (In)
3. 25-Pair Female Connector (Out)
4. 220029 Fuses (Inside Panel). Use 
Small Screwdriver to Pry Top Cover Off
Sneak
Current
Protector
507B
sneak CJL 032096