Справочник Пользователя для Pelco c1405M-E

Скачать
Страница из 16
Pelco Manual C1405M-E (11/03)
5
INSTALLATION
1.
Unlatch and raise the enclosure lid. The gas spring will hold the lid in place
when it is fully opened.
2.
Remove the camera sled from the rail:
a.
Loosen the screws.
b.
Slide the sled so that the screws are in the large part of the mounting
holes.
c.
Remove the sled.
d.
Remove the parts tied to the sled.
3.
EH4718-1, -2, -3 Models, and EH4722 -1, -2, -3 Models Only - If you are
installing the enclosure in a marine or high-moisture environment, make the
following modifications to your enclosure:
Refer to Figure 1 for an exploded assembly diagram of the blower assembly.
a.
Remove the two sets of screws and washers (A, B, and C) that secure
the fan shroud (3) to the bottom of the enclosure.
b.
Remove the four screws (D) that secure the fan (4) to the back of the
enclosure.
Figure 1.  Exploded Assembly Diagram for Blower and Circuit Board