Справочник Пользователя для Servis-Rhino 4211B

Скачать
Страница из 104
OPERATION
4211B   02/10
Operation Section 4-34
© 2010 Alamo Group Inc.
OPERA
T
ION
BACKFILLING
Approach pile with a level bucket.
Poor methods actually move no more dirt and make
it more difficult to hold a level grade.
Do not use bucket in dumped position for
bulldozing. This method, shown above, will impose
severe shock loadings on dump linkage, bucket
cylinder and tractor.