8.  Connect  an  accurate  AC  voltmeter  and  a  fre-
quency  meter  across  transfer  switch  terminal 
lugs E1 and E2. Voltage should be 242-252 volts; 
frequency should read about 61-63 Hertz.
9.  Connect  the  AC  voltmeter  test  leads  across  ter-
minal  lug  E1  and  neutral;  then  across  E2  and 
neutral. In both cases, voltage reading should be 
121-126 volts AC.
10. Set  the  generator’s  main  circuit  breaker  to  its 
OFF (or open) position. Let the engine run at no-
load for a few minutes to stabilize internal engine 
generator temperatures.
11. Set the generator's AUTO/OFF/MANUAL switch to 
OFF. The engine should shut down.
NOTE:
It  is  important  not  to  proceed  until  certain  that 
generator  AC  voltage  and  frequency  are  correct 
and within the stated limits. Generally, if both AC 
frequency and voltage are high or low, the engine 
governor requires adjustment. If frequency is cor-
rect,  but  voltage  is  high  or  low,  the  generator’s 
voltage regulator requires adjustment.
2.4  GENERATOR TESTS UNDER LOAD
To test the generator set with electrical loads applied, 
proceed as follows:
1.  Set  generator’s  main  circuit  breaker  to  its  OFF 
(or open) position.
2.  Set  the  generator's  AUTO/OFF/MANUAL 
switch to OFF.
3.  Turn OFF the utility power supply to the transfer 
switch, using the means provided (such as a util-
ity main line circuit breaker).
  Do not attempt manual transfer switch opera-
tion until all power voltage supplies to the 
transfer switch have been positively turned off. 
Failure to turn off all power voltage supplies 
will result in extremely hazardous and possibly 
fatal electrical shock.
4.  Manually set the transfer switch to the STANDBY 
position,  i.e.,  load  terminals  connected  to  the 
generator's E1/E2 terminals. The transfer switch 
operating lever should be down.
5.  Set  the  generator's  AUTO/OFF/MANUAL  switch 
to MANUAL. The engine should crank and start 
immediately.
6.  Let  the  engine  stabilize  and  warm  up  for  a  few 
minutes.
7.  Set the generator’s main circuit breaker to its ON 
(or  closed)  position.  Loads  are  now  powered  by 
the standby generator.
8.  Turn ON electrical loads. Apply an electrical load 
equal to the full rated wattage/amperage capacity 
of the installed generator.
9.  Connect an accurate AC voltmeter and a frequen-
cy meter across terminal lugs E1 and E2. Voltage 
should  be  greater  than  230  volts;  frequency 
should be greater than 58 Hertz.
10. Let the generator run at full rated load for 20-30 
minutes. Listen for unusual noises, vibration or 
other  indications  of  abnormal  operation.  Check 
for oil leaks, evidence of overheating, etc.
11. When  testing  under  load  is  complete,  turn  OFF 
electrical loads.
12. Set the generator's main circuit breakers to their 
OFF (or open) positions.
13. Let the engine run at no-load for a few minutes.
14. Set  the  AUTO/OFF/MANUAL  switch  to  OFF.  The 
engine should shut down.
2.5   CHECKING AUTOMATIC 
OPERATION
To check the system for proper automatic operation, 
proceed as follows:
1.  Set  the  generator’s  main  circuit  breaker  to  it’s 
OFF (or open) position.
2.  Check that the AUTO/OFF/MANUAL switch is set 
to OFF.
3.  Manually  set  the  transfer  switch  to  the  UTILITY 
position, i.e., load terminals connected to the util-
ity power source side.
4.  Turn ON the utility power supply to the transfer 
switch, using the means provided (such as a util-
ity main line circuit breaker).
5.  Set  the  AUTO/OFF/MANUAL  switch  to  AUTO. 
Then set the generator’s main circuit breaker to 
its  ON  (or  closed)  position.  The  system  is  now 
ready for automatic operation.
6.  Turn OFF the utility power supply to the transfer 
switch.
With  the  AUTO/OFF/MANUAL  switch  at  AUTO,  the 
engine should crank and start when the utility source 
power  is  turned  OFF.  After  starting,  the  transfer 
switch  should  connect  load  circuits  to  the  standby 
side. Let the system go through its entire automatic 
sequence of operation.
With  the  generator  running  and  loads  powered  by 
generator AC output, turn ON the utility power supply 
to the transfer switch. The following should occur:
•  After about 15 seconds, the switch should transfer 
loads back to the utility power source.
•  About  one  minute  after  retransfer,  the  engine 
should shut down.
Section 2 — Post Installation Start-up and Adjustments
Air-cooled 7 kW, 12 kW and 15 kW Generators