If applicable perform the following:
Apply commercial power to the internal battery charger
receptacle (to ensure good starting) via commercial power.
An external power cord will be required. This capability is an
option.
Apply commercial power to the jacket water heater
receptacle (not necessary for warm climates) via commercial
power. An external power cord will be required. This capability
is an 
option.
DCA-600SSK —   GEN. START-UP PROCEDURE (MANUAL)
Figure 43.   Load Connections
BEFORE STARTING
4. Close all engine enclosure doors (Figure 44).
Figure 44.  Engine Enclosure Doors
Steps 1 thru 19 are referenced
for Engine Operating Panel up
to S/N 3698616. See Figure 41
below. This unit has an 
ignition
switch and a throttle handle.
NOTE
Figure 41.  Engine Operating Panel
                    Up To S/N 3698616
1. Place the 
main, G.F.C.I.  and aux. circuit breakers (Figure 42)
in the “OFF” position prior to starting the engine.
2. Connect the load to the 
UVWO terminals or auxiliary
receptacles as shown in Figure 43. These load
connection points can be found on the output terminal
panel. To gain access to the UVWO terminals or other
power receptacles, unlock the access cover and lift the
door.
3. Tighten the UVWO terminal nuts securely to prevent
load wires from slipping out.
Figure 42.   Main, Aux. and GFCI
                  Circuit Breakers (OFF)
Generator and Control Panel
The engine's exhaust contains harmful emissions.
ALWAYS have adequate ventilation when operating.
Direct exhaust away from nearby personnel.
CAUTION - LETHAL EXHAUST HAZARD
NEVER! manually start the engine with the mainGFCI
or 
auxiliary circuit breakers in the ON (closed) position.
WARNING - STARTING THE GENERATOR