Справочник Пользователя для Ingersoll-Rand SLB600

Скачать
Страница из 20
MHD56109 - Edition 9
11
Brake End Assembly
Follow steps 1 through 6 described in ‘Load Sheave Assembly’ 
and steps 1 through 5 described in ‘Gear End Assembly’.
CAUTION
• The brake will not operate properly if there is oil or grease 
on brake friction disk (17). 
1.
Thread disk hub (15) onto drive shaft (3) until snug. Stepped 
side of brake hub must face out.
2.
Install pawl springs (13) and pawls (14) to posts on side 
plate assembly B (brake end) (12) and secure with snap rings 
(63).
3.
Install first friction disk (17) followed by ratchet disk (18) 
and second friction disk (17). Ratchet disk teeth must engage 
two pawls (14) mounted on side plate assembly B (12). Only 
clockwise rotation of ratchet disk (18) must be possible.
4.
Install brake lever cover assembly (19) on side plate 
assembly B (12). Brake cover assembly will locate on 
threaded spacers (94). Secure with prevailing torque type 
nuts (60).
5.
Install spring (16) on drive shaft (3) then secure load sheave 
(7) to prevent rotation and thread disk hub (15) onto drive 
shaft (3) until snug.
6.
Install change over spring (24), spring shaft (23) and change 
over pawl (22) in lever handle assembly (25).
7.
Install lever assembly on brake lever cover assembly (19). 
Secure with washers (65) and screw (64).
8.
Install screws (64) and washers (65).
9.
To assist further assembly move selector lever to UP 
position. Install hand wheel (28) and install screws (69) and 
washer (68).
10. Install bushing (31).
11. Install and castle nut (70) until snug and then back nut off 
3/4 turn and align slot with pin hole in drive shaft (3). Install 
split pin (71) but do not bend ends apart. Test to ensure 
adjustment block will freely move to free chain position. If 
not, back off nut one more slot and retest. Install and bend 
cotter pin ends apart.
12. Install cover (29) and secure in position with retainer wire 
(30).
NOTICE
• Ensure hoist will properly shift from UP, DOWN and 
NEUTRAL positions using selector lever. With selector lever 
in NEUTRAL (center) position, turn free chain knob 
counterclockwise. Ensure brake disengages and load chain can 
be pulled in both directions without sticking or binding. 
Bottom Hook Assembly
1.
On 6 ton double fall hoists grease and install rollers (97) in 
bore of idler sheave (56).
2.
Install idler sheave shaft (96) through idler sheave (56) bore. 
Ensure rollers (97) remain in position.
3.
Secure idler sheave shaft (96) with retainer rings (95) at both 
ends.
4.
Install hook (51) in hook block (57).
5.
Install idler sheave shaft (96) and secure with retainer ring 
(95).
6.
On single fall hoists install last link of load chain in hook 
assembly and install capscrew (52) and nut (77).
Gear Timing
For proper operation, timing marks on driver shaft gears (2) must 
be in correct positions. Timing marks are circular impressions 
near center of driver shaft gears (2). Refer to Dwg. MHP0827 on 
page 11.
(Dwg. MHP0827)
(3/4 ton shown) timing marks typical for 3/4 - 6 ton
Load Test
Prior to initial use, all new, extensively repaired or altered hoists 
shall be load tested by or under the direction of a person trained in 
the operation and maintenance of this hoist, and a written report 
furnished confirming rating of hoist. Test hoist to 125% of rated 
hoist capacity. Testing to more than 125% may be necessary to 
comply with standards and regulations set forth in areas outside 
of the USA.
3/4 ton