Справочник Пользователя для Mitsubishi Electronics QD64D2
4
- 2
4.2 Procedures before Operation
4
PROCEDURES AND SETTINGS BEFORE
OPERATION
4.2
Procedures before Operation
The following flowchart shows the procedures for operating the QD64D2.
Figure 4.1 Procedures before operation
Start
Module mounting
Mount the QD64D2 to the specified slot.
Mount the QD64D2 to the specified slot.
Wiring
Wire external devices to the QD64D2.
Wire external devices to the QD64D2.
Intelligent function module switch setting
Set the switches with GX Developer
(refer to Section 4.5).
Set the switches with GX Developer
(refer to Section 4.5).
Use GX Configurator-CT?
Yes
No
Make the initial setting?
Yes
Make the initial setting?
Yes
Initial setting
Create a sequence program for writing
initial values with the FROM/TO
instruction.
Create a sequence program for writing
initial values with the FROM/TO
instruction.
Make the auto refresh setting?
No
No
Yes
Programming
Create and a program for counter
processing without the FROM/TO
instruction and check it.
Create and a program for counter
processing without the FROM/TO
instruction and check it.
Programming
Create and a program for counter
processing with the FROM/TO instruction
and check it.
Create and a program for counter
processing with the FROM/TO instruction
and check it.
Operation
No