4   INSTALLATION, WIRING AND MAINTENANCE OF THE PRODUCT 
 
4.1 Outline of installation, wiring and maintenance 
4.1.1 Installation, wiring and maintenance procedures 
The outline and procedures for QD75MH installation, wiring and maintenance are 
shown below. 
 
Dispose of the QD75MH and SSCNET   
cable
STEP 1
 
 
 
 
STEP 2
 
 
 
 
STEP 4
 
 
 
STEP 5
 
 
 
 
 
STEP 6
 
 
 
 
STEP 7
 
STEP 8
 
 
 
Refer to 
Section 4.5
Refer to 
Section 4.5
Refer to 
Section 4.3
Refer to 
Section 4.3
Refer to 
Section 4.2
Refer to 
Section 4.1
Preparation
Understand the "Handling precautions" and 
"Names of each part" of the module (QD75
MH)
Installing the 
module
Install the module (QD75MH) on the base unit.
Wiring the 
module
Wire the external device connection 
connector pins, and assemble the connector.
 
 
Connect the cable to the module (QD75MH)
Wire and connect the manufactured cable to QD75 
MH after reading the precautions for wiring.
Confirming the 
installation and
wiring
Servicing the 
module
Confirm the connection
Check the connection using GX Configurator-QP.
Operation of the positioning system.
Carry out maintenance
Carry out maintenance as necessary.
When the QD75MH is no longer necessary, 
dispose of it with the specified methods.
Refer to 
Section 4.4
The cables used to connect the QD75MH with the
drive unit, with the mechanical system input
(each input/output signal), and with the manual
pulse generator are manufactured by soldering 
each signal wire onto the "external device 
connection connector" sold separately.(Refer to
"Applicable connector for external wiring" in 
Section 3.1 "Performance specifications" for 
the optional connector.)
STEP 3
 
 
 
Refer to 
Section 4.2
Understand the "Precautions for wiring of 
SSCNET    cable" before wiring of the 