Справочник Пользователя для Cellboost 999-823

Скачать
Страница из 88
3-16
Pre-Start Inspection and Operation
Figure 3–17 Trencher Boom in Raised Position
3. Depress (step on) and hold the operator presence control (Item 1, 
) in the “down” 
or activated position with your right foot.
Figure 3–18 Trencher Boom in Raised Position
1
2441
1
2426