Справочник Пользователя для Mitsubishi Electronics SDP-ECO 1630 III

Скачать
Страница из 83
SDP-Eco1630 III USERS MANUAL
- 10 -
Chapter 1  On Safety
1.6 Precautions during transport and installation
• The weight of the SDP-Eco 1630 III  is described in "Chapter 9:
Specifications"Make sure the floor is fully capable of handling 2500 N/m
2
(approx. 55 lbs/ft
2
) or heavier loading before installing the SDP-Eco 1630 III .
Transport and installation
This machine's transport and installation must always be handled by
engineers and contractors assigned by Mitsubishi Paper Mills Limited.
We shall bear no responsibility whatever for any unit breakage, damage,
or malfunctions caused by or during transport or installation performed by
anyone other than the above specified personnel.  Whenever your
machine must moved, transferred, or reinstalled, please entrust all
procedures to our nearest branch office or dealer. 
1.7 SDP-Eco 1630 III Installation
Installation environment
Installing the machine in the following locations may cause machine damage
or malfunctions.  Do not install the machine anywhere that is exposed or
subject to:
*
Locations with strong and/or 
persistent vibration
*
Locations with an uneven 
floor