Section 3      
Getting Started with SANbox SSP
This section describes the tasks you must perform before you begin to install, 
configure, and operate the SANbox SSP. The tasks should be performed in the 
order presented in this section. 
This section covers the following tasks:
3.1
 
Task Roadmap
 presents the roadmap for setup tasks.
Table 3-1. Roadmap of Setup Tasks  
For This Setup Step:
See:
1. For a high-availability system, 
obtain information about 
high-availability configurations 
that use SANbox SSPs and SVM 
appliances.
 for 
overview information.
 for specific information about setting up 
each component of a high-availability system.
2. Unpack and set up the hardware: 
mount the SANbox SSP in a rack, 
install the power supplies, and 
connect the console port.
.
.
3. Start up and configure the SANbox 
SSPs: configure the terminal 
settings on the host, use the serial 
console port, and modify the 
Ethernet settings for remote 
access.
.
.
4. Connect SVM appliances, 
SANbox SSPs, and hosts to the 
SAN.