This section describes the tasks you must perform before you begin to install,
configure, and operate the SANbox SSP. The tasks should be performed in the
order presented in this section.
configure, and operate the SANbox SSP. The tasks should be performed in the
order presented in this section.
This section covers the following tasks:
■
■
■
■
3.1
Task Roadmap
presents the roadmap for setup tasks.
Table 3-1. Roadmap of Setup Tasks
For This Setup Step:
See:
1. For a high-availability system,
obtain information about
high-availability configurations
that use SANbox SSPs and SVM
appliances.
high-availability configurations
that use SANbox SSPs and SVM
appliances.
■
for
overview information.
■
for specific information about setting up
each component of a high-availability system.
2. Unpack and set up the hardware:
mount the SANbox SSP in a rack,
install the power supplies, and
connect the console port.
install the power supplies, and
connect the console port.
■
.
■
.
3. Start up and configure the SANbox
SSPs: configure the terminal
settings on the host, use the serial
console port, and modify the
Ethernet settings for remote
access.
settings on the host, use the serial
console port, and modify the
Ethernet settings for remote
access.
■
.
■
.
4. Connect SVM appliances,
SANbox SSPs, and hosts to the
SAN.
SAN.
■