Справочник Пользователя для Q-Logic 8200 SERIES

Скачать
Страница из 118
5 – Maintaining the SANbox SSP
 
Replacing Hardware Components
5-6
 
SN0054628-00  A
Q
5.5.1
 
POST and the LEDs
Power-On Self Test (POST) is a diagnostic testing sequence that the SANbox SSP 
runs while powering on. If all the hardware is detected and found to be operating 
properly, SANbox SSP begins to boot. 
While the software is loading, all the port LEDs turn amber and then turn off. 
POST has successfully completed when all LED activity has stopped; this takes 
approximately 1-2 minutes. SANbox SSP has powered on successfully when the 
Alert LED is green, and all port lights are off. If POST never completes, all six LEDs 
remain amber.
NOTE:
The port LEDs blinks if there is traffic on the SAN.
5.6
 
Replacing Hardware Components
SANbox SSP comes with transceivers and fans already installed. This section 
provides information if you need to replace a fan, transceiver, or power supply. 
To replace the fans:
To replace Fan 1 or Fan 3 (40 mm fan), order replacement fan 097-0005 from QLogic 
Corporation. The kit includes instructions for replacing the fan.
To replace Fan 2 (80 mm fan), order replacement fan 097-0004 from QLogic 
Corporation. The kit includes instructions for replacing the fan.
To replace the power supplies:
Order replacement power supply 097-0006 from QLogic Corporation. The kit 
includes instructions for replacing the power supplies.
If you need to install the power supplies, see