Справочник Пользователя для APC 100 VAC
Hardwire Kit SMT2200/3000 VA 100/120/230 VAC Tower
2
Installation
Note:
It is recommended that the input and output cables be connected to the terminal block prior to
installing the terminal block in the UPS.
Remove the five screws that secure the factory
installed PDU panels to the UPS.
installed PDU panels to the UPS.
Save the screws.
Disconnect the PDU input and output cables as
shown in the diagram.
shown in the diagram.
Secure the replacement input and output panels
(supplied), to the UPS. Secure the panels with
four of the screws removed from the factory
installed PDU panel.
(supplied), to the UPS. Secure the panels with
four of the screws removed from the factory
installed PDU panel.
Install appropriate strain relief clamps (not
supplied), to the input and output panels as
shown in the diagram.
supplied), to the input and output panels as
shown in the diagram.