Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-96
ANN-BD (Announcement Circuit Pack) 
10
Announcement Checksum Test (#209)
Associated with every recorded announcement is a checksum. In this test, the 
SP checks a stored global checksum covering all recorded announcements 
against a calculated one and returns the results to the maintenance system. If the 
global checksum failed, maintenance requests the SP to check each individual 
announcement’s checksum.
If the test fails, then it returns the total number of defective announcements 
found. In addition, associated with each failure is an error in the Error Log (Error 
Type 14). The Aux Data indicates the number of the first defective announcement 
found. This number corresponds to the announcement numbers on the 
announcement form. The extension relating to the announcement can be 
determined by the 
display announcement
 command.
FAIL
Test failed. Circuit pack cannot be used. 
Announcement speech 
memory is cleared when this test fails. Therefore, when the problem 
has been resolved, announcements must be rerecorded or 
downloaded to the circuit pack.
 Refer to "General Notes" near the 
beginning of this Maintenance documentation.
1. Reset the circuit pack via the 
reset board PCSS
 command and then 
run this test again. If the test continues to fail, replace the circuit pack 
and then run this test again.
2. If there are recurring alarms on this circuit pack caused by this test 
failing, replace the circuit pack 
even if Step 1 works
.
!
WARNING:
Replacing the circuit pack results in loss of integrated 
announcements. See "General Notes" near the beginning of this 
Maintenance documentation.
PASS
The communications link between the two processors on the 
Announcement circuit pack is functioning properly. User-reported troubles 
on this circuit pack should be investigated using other circuit pack and 
port tests. Refer to "ANN-PT (Announcement Port)" Maintenance 
documentation for a description of the port tests.
Table 10-34.
TEST #208 Angel-Speech Processor (SP) Handshake Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page