Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-135
ASAI-EPT 
10
System Technician-Demanded Tests:
Descriptions and Error Codes
When inspecting errors in the system, always investigate errors associated with 
the circuit pack and port first. Clearing these error codes first may also clear 
errors generated against the endpoint. When all circuit pack and port errors have 
been cleared, but errors still exist against the endpoint, investigate errors in the 
table below. By clearing error codes associated with the Signaling Link Status 
Test, for example, you may also clear errors generated from other tests in the 
testing sequence.
BRI Layer 3 Query Test (#629)
This test is not used by the ASAI-ADJ maintenance object. For information about 
this test, see BRI-SET in the maintenance documentation.
Signaling Link Status Test (#626)
This test determines the current status of the signaling link. This test passes if the 
link is "bound" to an endpoint and fails if the link is "not bound."
The definition of the term "bound" for a link depends upon the type of endpoint 
and may depend on the successful completion of procedures at both Layers 2 
and 3 of the protocol. The definition of "bound" for ASAI type of endpoint is:
ASAI adjuncts and BRI endpoints not administered for MIM initialization 
(point-to-point):
For endpoints of this type, the signaling link is "bound" when the link is 
connected at Layer 2 (L2 established).
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Signaling Link Status Test (#626)
X
X
ND