Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-200
BRI-SET, ASAI-ADJ, BRI-DAT 
10
the table below. By clearing error codes associated with the 
Signaling Link 
Status Test,
 for example, you may also clear errors generated from other tests in 
the testing sequence.
Note:
a. Will execute the 
test port long PCSSpp
 command, and review the results 
of the BRI Port Local LAN Loop Around Test to verify the repair.
Signaling Link Status Test (#626)
This test determines the current status of the signaling link. This test passes if the 
link is "bound" to an endpoint and fails if the link is "not bound."
The definition of the term "bound" for a link depends upon the type of endpoint 
and may depend on the successful completion of procedures at both Layers 2 
and 3 of the protocol. The definition of "bound" for each type of endpoint is as 
follows:
BRI endpoints administered for MIM (management information 
messages) initialization (multipoint):
 
NOTE:
An MIM is a level 3 message that conveys management and 
maintenance information between a communications system and a 
BRI terminal.
For endpoints of this type, the signaling link is "bound" when the link is 
connected at Layer 2 and the link has been associated with an endpoint, 
[that is, the endpoint has completed SPID initialization (L3 established)].
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Signaling Link Status Test (#626)
X
X
ND
BRI XID Test (#628)
X
X
ND
BRI Layer 3 Query (#629)
X (a)
X (a)
ND
BRI Remote Loop Back (#627)
X (a)
ND
BRI Set Audits (#630)
X (a)
X (a)
ND
BRI Vendor ID Test (#631)
X (a)
ND
BRI Model/Vintage ID Test (#632)
X (a)
ND