Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-221
BRI-SET, ASAI-ADJ, BRI-DAT 
10
SPID Facility Test
This test is used to verify the wiring and operation of the signaling link between 
the switch and a endpoint or adjunct on a BRI interface. 
This test is not 
executed from the administration terminal, but rather is executed by using a 
BRI test set equipped with a display.
 The test set may replace the BRI set, 
ASAI or AT&T adjunct under test by plugging it into the same jack or by bridging 
it onto the wiring at some point between the switch and the endpoint (or adjunct), 
thereby creating a pseudo-BRI multipoint configuration.
When plugged into the port in this manner, the test set establishes a signaling 
link connection with the switch and attempts to complete SPID initialization by 
using the Service SPID administered for the system (see the System 
Maintenance Administration Form). If the test set displays the correct 
administered port address for the endpoint or adjunct under test, the test passes 
(see Service SPID Display which follows). If after one-minute nothing is displayed 
on the test set, the test fails.