Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-273
CARR-POW (Carrier Port Power Unit) for AC-Powered Systems 
10
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when 
inspecting errors in the system. By clearing error codes associated with the 
Battery & Battery Charger Query Test
, for example, you may also clear errors 
generated from other tests in the testing sequence.
Notes:
a. Refer to POWER (Battery & Battery Charger) Maintenance documentation 
for a description of this test.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
Battery & Battery Charger Query Test 
(#5) (a)
X
X
ND
AC Power Query Test (#78) (b)
X
X
ND
Power Unit Query Test (carrier E) 
(#127)
X
X
ND
Power Unit Query Test (carrier D) 
(#127)
X
X
ND
Power Unit Query Test (carrier A) 
(#127)
X
X
ND
Power Unit Query Test (carrier B) 
(#127)
X
X
ND
Power Unit Query Test (carrier C) 
(#127)
X
X
ND
Emergency Transfer Query Test 
(#124) (c)
X
X
ND
Cabinet Temperature Query Test 
(#122) (d)
X
X
ND
External Alarm Lead Query Test 
(#120) (e)
X
X
ND
Analog Ring Generator Initialization 
Test (#117) (f)
X
X
ND
Analog Ring Generator Query Test 
(#118) (f)
X
X
ND