Maintenance Object Repair Procedures 
Page 10-392
DATA-CHL (Network Control Data Channel) 
10
Data Channel Dual Port RAM Test (#108)
This test is destructive.
This is a coordinated test of the dual port RAM that is shared between the 
hardware and software composing the DATA-CON. Control messages and data 
are passed through this dual port RAM to establish and tear down connections 
over the DATA-CHLs. This test requests each side to read and write the dual port 
RAM, first one at a time and then simultaneously in alternate locations.
Table 10-108.
TEST #107 Data Channel Reset Test 
Error 
Code
Test 
Result
Description/Recommendation
1000
ABORT
System resources required to run this test are not available.
1. Try the command at 1-minute intervals a maximum of 5 times.
2011 
2012 
2013 
2016 
2017 
2020 
2022 
2030
ABORT
Refer to STBY-SPE (Standby SPE) Maintenance documentation for a 
description of these error codes.
2100
ABORT
System resources required for this test are unavailable.
ABORT
An ABORT has one of two different meanings:
1. System resources required to run this test are not available.
2. Internal system error
10704
ABORT
Internal system error
1. Try the command at 1-minute intervals a maximum of 5 times.
Any
FAIL
The circuit pack failed to reset.
1. Execute the command again.
2. If the problem persists, replace the TN777 Network Control circuit 
pack.
After the Network Control circuit pack has been replaced, its Time-of-Day 
clock must be set using the 
set time
 command. If this is a high or critical 
reliability system, set the Time-of-Day clocks as described in Chapter 6, 
"Reliability Systems: A Maintenance Aid", to ensure that the clocks on both 
Network Control circuit packs are synchronized.
PASS
The circuit pack initializes correctly.
Continued on next page