Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1126
POWER (Battery & Battery Charger) for AC-Powered Systems 
10
NOTE:
This test only shows up in the test sequence if there is a Tone-Clock 
circuit pack in the port network being tested.
Battery & Battery Charger Query Test (#5)
This test queries the Maintenance/Tape Processor in a multicarrier cabinet PPN 
system without High or Critical Reliability, the Duplication Interface circuit pack in 
a PPN for a High or Critical Reliability system, or the EPN Maintenance circuit 
pack in an EPN for the status of the battery pack and battery charger, and 
reports the result. During this test, the status LED battery charger is lit and 
extinguished if the status of the battery charger is reported as normal. This event 
is a result of checking that the battery charger is connected.
Table 10-332.
TEST #5 Battery & Battery Charger Query Test 
Error 
Code
Test 
Result
Description/ Recommendation
1000
ABORT
System resources required to run this test are not 
available.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the problem.
1005
ABORT
Battery Charger is not connected.
1. If the system has a UPS supplying the power, ignore 
this error since the UPS supplies the power, not the 
battery and battery charger.
2. The batteries probably need charging and may be 
drained if there were power outages. Reconnect the 
battery charger to allow the batteries to recharge. If 
Test #5 is run before the batteries are completely 
charged, the test fails.
3. Wait 24 hours and rerun the test.
Continued on next page