Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-1223
S-SYN-PT (Speech Synthesis Port) 
10
Speech Synthesis PSS Handshake Test (#168)
This test verifies control functionality between the on-board microprocessor and 
PSS controller. A failure occurs if either of the following events occur:
The on-board microprocessor times out while waiting for the PSS 
controller to respond.
An invalid command is received by the on-board microprocessor from the 
PSS controller.
This type of failure affects all four ports on the Speech Synthesis circuit pack, 
resulting in errors or alarms on each port.
1000
ABORT
System resources required to run this test are not 
available. The port may be busy with a valid call and 
therefore unavailable for certain tests. You must wait 
until the port is idle (yellow LED if off) before retesting.
1. If the port is idle, retry the command at one-minute 
intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
2000
ABORT
Response to the test request was not received within the 
allowable time period.
2100
ABORT
Could not allocate the necessary system resources to 
run this test.
1. Retry the command at one-minute intervals a 
maximum of five times.
2. If the test continues to abort, escalate the problem.
Any
FAIL
The SSD is insane.
1. Replace the circuit pack.
PASS
The SSD is sane. User-reported troubles should be 
investigated using other tests and verifying other ports 
on this circuit pack are working correctly.
Table 10-380.
TEST #167 Speech Synthesis SSD Inquiry Test  — 
Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page