Example — OPC Application for Industrial Ethernet
82
Commissioning PC Stations - Manual and Quick Start
Release 5/2005
C79000-G8976-C156-07
7.3
Creating the STEP 7 Project
7.3.1
STEP 7 Project Engineering on a Central Engineering Station
In the requirements, we have already said that you require a STEP 7 project for
this example. Below, you will find a brief outline of how such a project is created.
this example. Below, you will find a brief outline of how such a project is created.
Activity
1.
Create a project in the SIMATIC Manager.
2.
Insert a SIMATIC 400 station and a SIMATIC PC station.
3.
Create the hardware configuration including the network assignment and parameter settings of
the CPs.
the CPs.
4.
Save and compile the configuration.
Result: The current configuration is saved in the project, system data blocks are created, the
XDB file is created and any system errors are displayed.
XDB file is created and any system errors are displayed.