Справочник Пользователя для American Power Conversion AP9618

Скачать
Страница из 26
Installation and Quick Start
9
Expansion/Triple Chassis Installation
Step 2: Install 
the Network 
Management 
Card
If the 
UPS
 uses more than one 
APC
 management product, see 
Installation of Multiple Management Cards, a copy of which 
came with the Management Card. You must install the APC 
management products in the correct order for them to operate 
properly.
1. If a cable is connected to the serial port at the UPS or 
chassis, stop the APC service that uses that serial 
connection and disconnect the cable.
2. If you are installing a chassis, connect the chassis to the 
UPS serial port.
3. Use the same screws that hold the expansion slot cover in 
place to secure the Management Card in the chassis slot.
4. Connect a network interface cable to the Management 
Card’s 10/100Base-T network connector.
5. If you are using the 
AC
 Adapter (AP9505):
a. Connect the adapter to the chassis.
b. Connect the adapter to an independent 
AC
 input so 
that the Management Card can continue to operate if 
the 
UPS
 is turned off or fails.
6. If you disconnected a cable in step 1, reconnect that 
cable to the serial port at the chassis, and restart the 
associated APC service.
Caution
The Network Management Card is sensitive to 
static electricity. When handling the Management 
Card, touch only the end plate while using one or 
more of these electrostatic-discharge devices 
(ESDs): wrist straps, heel straps, toe straps, or 
conductive shoes.