Справочник Пользователя для Panduit DPOE12U1XY

Скачать
Страница из 64
PANDUIT
® DPoE™ Power Patch Panel User’s Guide 
Issue 2.2 
 
 
Part Number: PN378A 
 
 
 
 
 
  
32
 
 
 
 
 
8.  Once all of the information is entered, click the Save button and this information will be saved to 
the panel and the graphic for the rack will be shown in the Element Manager Tree View of the 
Network area along with a graphical representation of the panel with the proper name. (See page 
23, Figure 3: System-Level Opening Screen, for more information.) 
 
9.  Other newly discovered panels can be easily provisioned by copying the Panel Attributes from 
this panel, and making changes where needed for the new rack names, rack positions, panel 
name, etc. This can be done by selecting the table row with the last provisioned panel, right-
clicking, and choosing “Copy Panel”. Select the next panel to be provisioned by highlighting the 
row of the panel, right clicking, and choosing “Paste Panel." All of the Panel Attributes will be 
applied to the new panel. Select “Edit Panel” and edit Panel Attributes and make the appropriate 
modifications. 
 
 
 
 
 
10.  The previous step should be repeated for each panel in the network until all the panels have been 
provisioned. Once this is done, the Element Manager can easily manage all of the powered 
devices using the more intuitive physical location information that is stored in each panel.