Справочник Пользователя для Enterasys Networks BL-69108ENT

Скачать
Страница из 36
Powering Up
Single-Port Power Over Ethernet Adapter User’s Guide 2-3
Powering Up
Simply plug one end of the power cord or power supply into the 
unit, and the other end into a grounded AC power source. Units 
are typically connected to a power strip or other power outlet 
that may be cycled on and off. An uninterruptible power supply 
(UPS) may be used.
Figure 2-1  BL-69551ENT Schematic Block Diagram
Description of LED Functions
Power-up Sequence
Upon power‐up, all 3 LEDs will light for 2 seconds, as part of the 
self‐test for the internal microprocessor software. After the end of 
the 2 seconds, the “ON” LED will illuminate green, signifying 
that the DC output voltage is available for powering a compliant 
load (to the 802.3af PoE standards).
RJ45
+
-
RJ45
1
2
3
6
4
5
7
8
1
2
3
6
4
5
7
8
Data &
Power
Out
Data
In
ON (green)
FAULT (red)
CONNECT (green)
PoE
Power &
Control