Справочник Пользователя для Acer AcceleRAID 170

Скачать
Страница из 86
Installation Process
2-10
AcceleRAID 170 Installation Guide
Preparing the SCSI Drives
To prepare the drives for installation, follow these steps:
1. Remove any terminators attached to the drive or set any drive 
termination jumpers to the disabled position.
2. Set the SCSI IDs on the drives.
3. Enable term power on the drives.
Refer to the drive manual for specific information about drive configuration 
settings.
Installing Cables and Setting Termination
Please refer to Table 2-3 on page 2-15 for SCSI Formats and Bus Length 
requirements.
4. Connect the SCSI cable from the internal disk drive to the SCSI 
connector on the AcceleRAID 170 controller as shown in
 Figure 2-8. (The controller is already connected to the system board.)
Figure 2-8. Connecting Disk Drives to the AcceleRAID 170