Module Assembly Key Point - Optical Engine 
 
1.  Light Pipe Module assembly and overfill alignment 
 
1.1  Assembly LP Module to HSG DMD 
i. Assembly two Overfill adjustment screws to HSG DMD (Fig. 1-1). 
** Adjustment criteria refer to below item (Fig. 1-2). 
ii.  Assembly “Clip LP” and lock with screw well (Fig. 1-3). 
iii.  Press CLIP of RE_BKT_LP first, and then push it into the hole (Fig. 1-4). 
iv. Placed LP Module on LP datum of “DMD HSG” and adjustment screw well, shown 
v.  (Fig. 1-5). 
vi.  Assembly “Baffle LP” first (Fig. 1-6) & push “Baffle LP” to hook DMD HSG 
    (Fig. 1-7). 
vii.  When Lock the screw of Baffle LP, the hand must push the left corner of Baffle LP 
before (Fig. 1-8). 
viii.  Lock the screw of Baffle LP well then release the hand (Fig. 1-9).
 
 
1.2  Overfill Adjustment @ LP Module   
          Overfill Adjustment Criteria: 
i.  Pre-assembly 2 adjusting screws. Criteria shown as (Fig.1-2) 
ii.  Alignment Sequence: 
a.  To adjust “Horizontal Adjustment Screw” firstly, and then “Vertical Adjustment 
Screw”. 
b.  Refer to Fig. (1-2) 
 
1.3  For Overfill Re-adjustment: 
a.  Those 2 Adjustment Screws must be released closely to the “Pre-assembly” 
positions first (Fig. 1-24-9). 
b.  ollow adjustment steps shown in Item 1-24.5-ii.   
 
Fig. 1-1 
Overfill Vertical 
Adjustment Screw 
Overfill Horizontal 
Adjustment Screw