Справочник Пользователя для Emerson 48330

Скачать
Страница из 96
Chapter 3  Startup      31 
ACTURA Flex 48330
 
Power System  User Manual 
3.2  Startup Process 
Item 
Action 
Result 
Comments (Fill 
in “OK” or not) 
The LEDs on the rectifiers and the 
controller will emit light.
 
 
The rectifier fans will start.
 
 
The LVD contactors will operate.
 
 
Connect/switch on the mains supply 
fuses/circuit breakers of the DC shelf.
 
The green LEDs of the rectifiers and 
the controller will flash for about 10 s. 
and then emit steady light.
 
 
Check the DC voltage on the test outlet 
marked U in the supervision unit.
 
The voltage should be close to what 
has been set in the controller.   
If temperature compensated charging 
is activated, the difference may be 
±
V from the set value.
 
 
If temperature compensated 
charging is activated, warn the   
sensor on the battery with your hand 
and observe the system voltage.
 
The voltage should start to drop.
 
 
Switch on the battery circuit breakers.
 
The battery voltage will increase and 
reach the system voltage. 
(Might take hours, depending on the 
charging state of the battery.)
 
 
Switch on the circuit breakers in MFU.
 
The loads will get DC supply.
 
 
Check all the LEDs of the shelf. 
 
Only the green LEDs are On should 
emit light. No LED shall flash.
 
 
 
3.3  Parameters Configuration  
After start up the DC Power System, following parameters need to be configured: 
Password, AC parameters, DC parameters, rectifier parameters, battery 
parameters, time and communication parameters. 
Refer to Chapter 5 on how to configure the parameters.