 Installation 
Guide 
SG Series 225 & 300 kVA 
SG
S_225
-300_
R
PA c
o
nt
ro
l bu
s c
a
bl
e_
0
2U
S
Q1
Q2
2
4
3
1
3
4
2
1
JA1
1
3
4
2
4
2
3
1
Q1
Q2
JB1
UPS 1
UPS 2
JA2
JB2
unit 3, 4, 5,
Next parallel
6, 7, 8
JB1
JA1
JA
JB
JA
JA2
JA1
JB1
JB2
JB
 
Fig. 3.11-3   Control Bus cable routing and connection
 
 
Control bus cables routing 
 
Place and fix the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 inside the UPS cabinets in the 
position illustrated in the drawing. 
 
 
 
Pay attention when cabling and routing the bus cables JA and JB inside the 
UPS cabinet. 
In case one unit should be removed from the parallel system, the bus cables 
JA  
and  JB  must be removed from the cabinet without disconnecting them 
from the metal plate where the sockets JA 
and JB are located. 
 
For reliability reasons the cables JA-1/2/3/4/5/6/7 and JB-1/2/3/4/5/6/7 connecting the units 
should be run in separated protected conduits (as indicated in fig. 3.11-3) separated from the 
power cables. 
 
It is important that the cable JA must be the same length as cable JB
 
 
The connection of the control bus cable in a UPS system already powered 
requires a special reset operation, which can be made by only a trained 
operator.