Справочник Пользователя для Liebert NXL

Скачать
Страница из 20
Installation Drawings
11
Figure 3
Top cable entry routing and installation order
The cables must be routed
around the fault braces. This is
to prevent the cables from
coming in contact with
other busbars.
FAULT BRACE
OUTPUT
FAULT BRACE
RECTIFIER INPUT
FAULT BRACE
BYPASS INPUT
BYPASS NEUTRAL
DC (POSITIVE)
DC (NEGATIVE)
GROUND (TOP ENTRY)
BYPASS INPUT
RECTIFIER INPUT
OUTPUT
OUTPUT NEUTRAL
GROUND
(BOTTOM ENTRY)
FRONT VIEW
DC CONDUIT
Recommended order of installation for cables:
1. DC Power
2. Bypass Neutral
3. Bypass Input Power (Phases A-B-C)
4. Rectifier Input Power (Phases A-B-C)
5. Output Power (Phases A-B-C)
6. Output Neutral
7. Ground
OUTPUT (PHASE C)
RECTIFIER INPUT
(PHASE C)
BYPASS INPUT
(PHASE C)
BYPASS NEUTRAL
OUTPUT NEUTRAL
FAULT BRACE
BYPASS INPUT
FAULT BRACE
RECTIFIER INPUT
FAULT BRACE
OUTPUT
DC (POSITIVE)
DC (NEGATIVE)
BYPASS CONDUIT
INPUT CONDUIT
OUTPUT CONDUIT
SIDE VIEW