Installation and Troubleshooting 2 - 7
Installing the Cable Tray
The cable tray that comes standard with the concentrator helps to manage 
the cables that run from the front of the unit so they are fed under the unit 
and out through the back.  The tray also provides the required space 
between the bottom of the unit and the next device in the rack (or the top 
of the table) so there is adequate air flow to cool the unit.
Caution:
If you choose not to use the cable tray beneath your 
unit, you must ensure that  1 3/4" (4.45 cm) of space is 
open below the ONline unit to ensure adequate 
incoming airflow (provided by the installed feet).
4
Set up the power supply.
Selecting the Power Supply 
Voltage
5
Install the ONline Controller 
Module in the concentrator.
Installing ONline Modules
6
Install media modules in the 
concentrator.
Installing ONline Modules
7
Connect the network 
cables to the media 
modules.
Connecting Network Cables
8
Power up all network 
devices and verify the 
installation.
Power Up and Verification
Table 2-1.  Steps for Installing the ONline System Concentrator
 (Continued)