Справочник Пользователя для Enterasys Networks 2G4072-52

Скачать
Страница из 70
Connecting Power
3-4 Installation
Connecting Power
To connect the module to the power sources, refer to 
 and proceed as follows. 
To connect the module to the power sources, refer to 
 and proceed as follows: 
1.
Plug a power cord into each switch AC power receptacle. To take advantage of 
redundancy capabilities, plug each power cord into a separate dedicated AC outlet.
2.
Plug the cord into a dedicated grounded AC outlet as shown in 
Figure 3-3  Connecting Power
3.
Observe the LANVIEW LEDs. The Power (PWR) LED (not shown), located on the 
front panel, turns ON (green) and the CPU turns red until the module completes its 
initialization. It takes under 30 seconds for the module to boot up.
If the initialization process is successful, the CPU LED turns green. If the CPU LED does 
not turn green, refer to 
 for troubleshooting information.
Note: The two power supplies in the module have automatic voltage sensing that allows 
connection to power sources ranging from 100–125 Vac, 2.5 A or 200–240 Vac, 1.25 A, 
50/60 Hz.
AC power cords
AC power outlets
AC power receptacles
Note: If the power-up sequence is interrupted on this device, or if optional hardware has 
been installed or removed, this device may run an extended diagnostics sequence that 
may take up to two minutes to complete.
AC INLET 1
100 - 125V ~ 3.6A
200 - 240V ~ 1.6A
50/60 Hz
AC INLET 2
100 - 125V ~ 1.8A
200 - 240V ~ 0.8A
50/60 Hz
Á
Á
À
À
Â
Â