Task 15: Verify Switch-to-Management Server Communication
2-55
Installation Tasks
Task 15: Verify Switch-to-Management Server Communication
Communication must be verified between the switch and server 
(SAN management and Element Manager applications). To verify 
switch-to-server communication:
1. At the SAN management application’s main window (physical 
map or product list), inspect the shape and color of the status 
symbol associated with the switch product icon
explains operational states and associated symbols.
2. Right-click the switch icon. A pop-up menu appears.
3. Select the Element Manager option from the pop-up menu. When 
the Element Manager application opens, the last view (tab) 
accessed by a user opens by default. As an example, the Hardware 
View
 is shown.
4. Inspect switch status at the Hardware View and perform one of the 
following steps:
a. If the switch appears operational (no FRU alert symbols and a 
green circle at the status bar), go to Task 16, Configure PFE 
Key (Optional).
Table 2-5
Switch Operational States and Symbols
Operational State
Symbol
Operational - switch-to server communication is established, the switch 
is operational, and no failures are indicated. Go to 
No status 
symbol
Degraded - switch-to server communication is established, but the 
switch is operating in degraded mode and requires service. This 
condition is typical if a port or redundant FRU fails. Go to 
Failed - switch-to server communication is established, but the switch 
failed and requires immediate service. Go to 
.
Status Unknown - the switch status is unknown because of a  network 
communication failure between the switch and management 
server. 
Go to 
.