Справочник Пользователя для Adtran ADT-1234POE

Скачать
Страница из 76
NetVanta 1000/1000R Series Hardware Installation Guide
 Unit Installation
61200500L1-34N
Copyright © 2008 ADTRAN, Inc.
53
5.
UNIT INSTALLATION
The instructions and guidelines provided in this section cover hardware installation topics, such as mounting 
options, supplying power to the unit, and installing option cards. These instructions are presented as follows:
For information on configuring a specific application, refer to the quick configuration documents provided on 
the AOS Documentation CD, or the AOS Command Reference Guide (also included on your CD). 
Tools Required
The customer-provided tools required for the hardware installation of the NetVanta are:
Ethernet cables
Network cables (module dependent)
DSX-1 cable (T1/FT1 + DSX-1 module only)
DBU cable (dial backup functions require an optional DIM)
Phillips-head screwdriver (rack-mounted applications only)
To prevent electrical shock, do not install equipment in a wet location or during a 
lightning storm.
Electronic modules can be damaged by static electrical discharge. Before handling 
modules, put on an antistatic discharge wrist strap to prevent damage to electrical 
components. Place modules in antistatic packing material when transporting or storing. 
When working on modules, always place them on an approved antistatic mat that is 
electrically grounded.
To access the CLI of the NetVanta, you will also need a VT100 terminal or PC with 
terminal emulation software and a console port cable. Instructions on how to access the 
CLI are given in the AOS Command Reference Guide (provided on the AOS 
Documentation 
CD).