Справочник Пользователя для Acer G901

Скачать
Страница из 244
 Appendix A: System rack installation
154
3
Attach the three bushings on the left frame wall of the chassis 
(Figure 63, E) in the pattern shown in Figure 65 using the same 
procedure described in step 1.
Installing the handles and rails
To complete the installation the rack conversion kit contents, you must 
also have the rack-mount rail kit.
WARNING!  To avoid personal injury when handling the 
server, use a hand-truck or other mechanical assist unit to 
move the server from one location to another.  Do not 
attempt to lift or move the server by the handles on the 
power supplies.
Refer to the installation guide that came with the rack-mount rail kit 
for detailed instructions on installing the handles and rails, as well as 
mounting the server in the rack.
Figure 63- Installing the bushings
BB!H:11!vh!.!FO/cppl!!Qbhf!265!!Gsjebz-!Kbovbsz!28-!3114!!8;24!QN