Preparing for Installation and Upgrades 
1-4
Review Configuration and Equipment 
1
Required Hardware
 lists the required equipment for standard, high, critical reliability, and 
ATM network duplication configurations.
To test the synchronization splitters, you need the following equipment:
Phoenix 1541C Test Set with accessory cord kit
Phoenix 5575A T1 Test Set with cord kit or equivalent
700A DS1 CPE Loopback Jack
1
 (comcode 10798867)
103A block
1541CC cable kit
Table 1-1.
Minimum required equipment for Release 8 ATM-PNC configurations 
Equipment
Reliability level
Standard
High
Critical/ATM 
Network Duplication
ATM switch
1
1
2
TN2305/TN2306 ATM interface
1
 
for each PN
1.
TN2305 (multimode fiber); TN2306 (single-mode fiber) for Release 8 ATM-PNC.
1
1
2
2.
High reliability requires 2 ATM-EI circuit packs in the PPN and 1 ATM-EI in each EPN.
2
T1 or E1 synchronization splitter
3
3.
The number and uses of the synchronization splitter depend on the configuration and the source(s) 
from which primary and secondary synchronization is derived. You may need 1 sync splitter per 
ATM switch. DS1 synchronization requires either no sync splitter or up to a number twice the 
number of sites.
1
1
1
SC-connected fiber optic cable
4
4.
Existing fiber optic cable may require an ST-to-SC adapter, depending on the interface at the ATM 
switch. The 
TN2305/TN2306
 circuit pack requires an SC connector (1 adapter is included in the 
Fiber Pass-Through Kit).
1
2 (PPN)
1 (each EPN)
2
TN771 maintenance/test circuit 
pack
5
5.
For network duplication; required for systems supporting PRI, BRI, or ASAI.
1
1.
See DEFINITY ECS Release 8 Maintenance for R8r, Chapter 6, DS1 Loopback Test for 
more information.