Справочник Пользователя для Lucent Technologies Comcode 108678723

Скачать
Страница из 230
DEFINITY ECS Release 8.2 ATM Installation,
Upgrades, and Administration  
555-233-124  
Issue 1
April 2000
Upgrading to ATM-PNC 
4-2
Preparation 
4
Preparation
 lists the installation items that must be completed and the equipment or 
materials available before starting the upgrade procedure. We assume that in 
DEFINITY ECS Release 6.3r or later with ATM-PNC that the ATM switch and 
interface circuit packs are installed and administered.
 lists and describes the equipment and materials required for an ATM 
upgrade.
Table 4-1. Installation checklist for DEFINITY ECS with ATM installed
Component
Description
Cabinet
Installed and fiber-prepped (fiber pass-through)
Timing (if 
needed)
T1 or E1 synchronization splitter installed and stable timing source 
present
ATM switches
ATM switches installed and fiber connected
ATM interfaces
All ATM interface circuit packs (TN2305/TN2306) installed and 
able to receive and pass on synchronization
Required circuit 
packs
All circuit packs required for DEFINITY ECS Release 8 are 
installed and administered.
Critical reliability/network duplication only
Duplication
2 independent switches or 1 switch with duplicated switch 
fabrics and controls. 
Independent fiber optic connections between the OC-3/STM-1 
ATM interfaces and each duplicated switch fabric
Power supply
No one power failure (other than the commercial AC source) able to 
cause
both pairs of switch fabric and controls to simultaneously fail—
no one power failure (excluding AC source)
all interface circuits to  fail simultaneously
Back up power
Back up option (independent of commercial AC source) installed
Continued on next page