Справочник Пользователя для Nortel Networks 3500

Скачать
Страница из 342
Operation, administration, and maintenance (OAM) features   2-145
Planning and Ordering Guide—Part 1 of 2   NTRN10AN    Rel 12.1   Standard   Iss 1   Apr 2004
A STS-1 managed DS1 facility is cross connected to other endpoints in the NE 
together with the other 27 DS1 facilities in one of the three facility groups on 
the OC-3 card on the DSM by connecting the STS1 that corresponds to that 
group of facilities. 
 provides the STS1 endpoints to 
DS1 facility grouping assignments.
The STS-1 managed DSM will support the following STS-1 PM parameters:
Code Violation-Path (CV-P)
Errored Seconds-Path (ES-P)
Severely Errored Seconds-Path (SES-P)
AIS/LOP Seconds-Path (ALS-P)
Unavailable Seconds-Path (UAS-P)
Table 2-29
STS1 endpoints to DS1 facility grouping assignments
STS1 AID
Where <hslot> = 3 through 10
<hport> = 1 through 4
STS1 AID is used to perform BWM operations on the 
group of DS1 facilities:
OC3-1-1-1-%HLINK-OC3-<hslot>-<hport>
in ports 1 through 28 of a DS1 DSM
OC3-1-1-2-%HLINK-OC3-<hslot>-<hport>
in ports 29 through 56 of a DS1 DSM
OC3-1-1-3-%HLINK-OC3-<hslot>-<hport>
in ports 57 through 84 of a DS1 DSM