Справочник Пользователя для Vulcan-Hart 1ER50A

Скачать
Страница из 52
 
 
Place fryer as near to its final position as possible.  Connect 3 phase line to X, Y and Z on 
terminal block. To reach terminal block, remove electric cover plate from fryer. 
 
For each 15
½
” (39 cm) and 21” (53 cm) section, a 3 phase supply line capable of handling 
the required KW at the fryer’s rated voltage (208, 240, and 480) is needed.  Refer to the 
fryer data plate for this electrical information.  
 
                  To shield electric connection supply wiring, a permanently connected or direct 
wired device must be installed using flexible conduit sleeve with the appropriate 
connectors.  
 
 
 
LEVELING THE FRYER 
 
Check the level of the fryer by placing a level on top of the fryer after electrical 
connections have been made. 
 
Ensure that the fryer is level front-to-back and side-to-side in the final installed position. 
 
If using casters, lock the wheels after unit is level. 
 
 
 
OPERATION 
 
   
 
     Hot oil and parts can cause burns.  Use care when operating, 
  
 
     cleaning and servicing the fryer. 
 
 
 
    Spilling hot frying compound can cause severe burns. Do not move 
       
               fryer without draining all frying compound from the tank. 
 
               
 
OVER-TEMPERATURE SHUTDOWN 
 
If the shortening becomes overheated, a high-temperature shutoff device will turn the 
heating elements off shutting down the fryer. 
 
If the fryer shuts down due to overheating, do not turn fryer on until the shortening 
temperature is below 300°F (149°C). 
 
If an overheating situation persists, contact your local Vulcan-Hart authorized service 
office. 
 
 
BEFORE FIRST USE 
Cleaning 
New units are wiped down at the factory to remove any visible signs of dirt, oil, grease, 
etc. remaining from the manufacturing process.