Справочник Пользователя для Mitsubishi Electronics SW1-GTD2-O-E

Скачать
Страница из 234
4 - 2 
4 - 2 
 
4.2  Creating a New Project   
A new project is created.   
 
  Perform either of the following operations. 
• Click 
 (New).  
 
• Select [Project] 
 [New] menu.  
 
  The system environment dialog box appears. Perform the system settings. 
For items other than [System settings], refer to the manual below: 
 
  GT Designer2 Version1 Reference Manual   
 
 
 
Item 
Description 
GOT type 
The GOT type to be used is set. 
 
 
PLC type 
The PLC type to be connected is set. 
Refer to the manual below for details of the PC type. 
 
  GT Designer2 Version1 Reference Manual 
 
 
System 
settings 
Color settings 
Screen color displayed on the GOT is set. 
Select the color according to the GOT display color. 
 
 
 
Point
 
 
Change of GOT type 
Refer to the manual below for cautions when changing GOT type. 
 
  GT Designer2 Version1 Reference Manual 
 
  After system settings, click the    OK    button to go to operation of New Screen.   
 
  Section 4.5 Creating a new screen 
 
 
 
 
 4