Справочник Пользователя для Mitsubishi Electronics sw1dnd-iqwk-e

Скачать
Страница из 124
4 - 19
1
OV
E
R
VI
EW
2
SC
R
E
E
N
 
CONFIGURA
TION
3
OPERA
TING PROCEDURE 
OF MEL
SOFT 
NA
VI
GA
TO
R
4
USI
N
G SYSTE
M
 
LAB
E
LS
5
C
R
E
A
TI
NG SY
STEM 
BACKUP
 DA
TA
6
USI
N
G P
R
OG
RA
M
 
JUMP FUNC
TION
4.4 Checking System Labels
4.4
Checking System Labels
This section explains a method for batch checking conditions such as; module configurations of created 
system configuration, project allocation status, and system label consistency.
1.
Select [Workspace] 
⇒ [Check] ⇒ 
[Batch Check] in the menu bar.
2.
The message shown on the left is 
displayed.
Read the message and click the 
 
button.
3.
The message shown on the left is 
displayed when a project is being 
opened in the workspace.
Read the message and click the 
 
button.
4.
The batch check is completed, and the 
message shown on the left is 
displayed.
For performing the batch verification of 
parameters, click the 
 button.
5.
The message shown on the left is 
displayed.
Read the message and click the 
 button.
6.
Execute the verification.
Error or Warning is displayed when the 
verification result contains an error. Check 
the error description on the Task List 
window and correct the error.
Select