Справочник Пользователя для Zephyr ZGE-E30AS

Скачать
Страница из 49
10
www.zephyronline.com
Installation – 
Installing the Hood 
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
1) Prepare electrical wiring and ducting in cabinet.  Location of junction box and blower outlet can be found on page 8.
2)  Unscrew  the  (10)  screws  from  front  panel  and  place                           
    the panel aside, Fig.3.  You will now have access to the   
    interrior of the range hood.
Fig.3
Fig.4
3) Open cabinet doors.  Lift range hood and slide it through
    the opening located in the bottom of the cabinet, Fig.4.
    Make sure opening matches the dimensions on page 9,
    Fig.1.
4) There are spring clips located on the left and right sides  
    of the hood body which will temporarily hold the hood in
    place, Fig.5.
Fig.5
Fig.6
5) Secure upper brackets to left and right sides of hood
    body by using (2) 3/16 x 3/8” screws for each bracket.
    Fig.6.  Make sure the (2) captive nut screw holes on
    the bracket are facing downward. Note: Due to limited
    workspace in 30” cabinets you will need to use a right
    angle or 2” long Philips head screwdriver.
1
2