Справочник Пользователя для Agilent Technologies 6684A

Скачать
Страница из 156
 Verification   19
 
Constant Current (CC) Tests
 Test Setup
 Connect the appropriate current monitoring resistor (see Table 2-l) as shown in Fig. 2-3. The accuracy of the resistor must
be as specified in the table.
 Test Procedures
 The test procedures are given in Table 2-5. The tests are independent and may be performed in any order. The CC tests are:
 
•  Current Programming and Readback Accuracy.
•  CC Load Effect.
•  CC Source Effect.
•  CC Noise (PARD).
Table 2-5. Constant Current (CC) Tests
Action
Normal Result
Current Programming and Readback Accuracy
This test verifies that the current programming and readback are within specification.
1
Turn off the power supply and connect the current monitoring resistor as
shown in Fig. 2-3. Connect a DVM across the resistor .
2
Turn on the power supply and program the output for 5 volts and 0
amperes.
3
Short the load.
4
Observe the DVM voltage reading. Divide this by the resistance of the
current monitor resistor. Record the result as the Low Current value.
Value within specified Low Current
limits.
5
Record the front panel display readback.
Value within specified readback limits.
6
Program output current to full scale (see Table 2-2).
7
Repeat Steps 4 and 5.
Both current readings within specified
High Current and readback limits.
CC Noise (PARD)
Periodic and random deviations (PARD) in the output (ripple and noise) combine to produce a residual ac current
superimposed on the dc output current. This test measures CC PARD, specified as the rms output current over the
frequency range of 20 Hz to 20 MHz.
1
Turn off the power supply and connect the current transformer, resistor,
capacitor and rms voltmeter (see Fig. 2-4).