2.  Drill a pilot hole approximately 1/4" (6 mm) outside of the marked 
circle. This  pilot  hole  is  used  as  a  starting  point  for  a  saws-
all  or  sabre  saw  blade.  Cut  around  the  marked  circle  staying 
approximately one quarter inch outside the line. (This will allow 
the vent pipe to easily slide through the opening). The resulting 
gap will be covered by the roof boot/flashing.
3.  Suspend the pipe through center of hole using proper support.
4.  Slide roof boot or equivalent flashing over pipe and secure roof 
boot equivalent flashing to roof.
5.  Seal around flashing.
6.  Terminate intake terminal and exhaust vent terminal facing down. 
See Figure .
 
 
FIGURE 11.
INSTALLATION OF VENT SYSTEM
 WARNING
THE  OPTIONAL  INTAKE  VENTING ARRANGEMENT AND THE 
EXHAUST VENTING ARRANGEMENT MUST BE INSTALLED TO 
RUN DIRECTLY TO THE OUTDOORS AND NOT IN ANY WAY BE 
CONNECTED TO ANOTHER VENTING SYSTEM (I.E. FURNACE, 
DRYERS  OR  SPACE  HEATERS).  IT  IS  CRUCIAL  THAT  THE 
VENTING ARRANGEMENT BE KEPT SEPARATE FROM OTHER 
VENTING SYSTEMS. IF THIS WARNING IS IGNORED, AND THE 
SYSTEM IS VENTED INCORRECTLY, IT MAY CAUSE IMPROPER 
OPERATION, FIRE, EXPLOSION, OR ASPHYXIATION.
1.  Plan the route of the vent system from the vent termination to the 
planned location of the appliance. Layout the total vent system 
to use the minimum of vent pipe and elbows possible.
2.  This unit is certified for the use of 4-inch PVC pipe for venting. 
The maximum length of 70-equivalent feet of 4-inch PVC pipe 
may be used for the intake venting arrangement and a maximum 
length of 70-equivalent feet of 4-inch PVC pipe may be used on 
the exhaust venting arrangement. If the gas pressure (dynamic) 
is set between 7” wc - 9” wc, the maximum allowed length is 
80 equivalent feet for both air intake and exhaust venting. The 
maximum number of  90 degree elbows for the 4-inch venting is 
six (6) in the intake and six (6) on the exhaust. A 90 degree elbow 
is equal to five (5) equivalent feet of 4-inch pipe. One 90 degree 
elbow is equaled to two 45 degree elbows. 
Table 2.  VENT LENGTH TABLE
3.  The  unit  is  certified  to  a  minimum  amount  of  4-inch  pipe  for 
the exhaust venting arrangement of 15-equivalent feet. This is 
the minimum amount of pipe required for the exhaust venting 
arrangement. The intake venting arrangement is certified to use 
a minimum of 0-equivalent feet of 4-inch PVC pipe.
IMPORTANT
When multiple units are direct vented through a wall (4-inch venting), 
all intake vent terminals should be no lower than the highest exhaust 
vent terminal.
NOTE:  This unit can be vented using only PVC (Class 160, ASTM 
D-2241 Schedule 40, ASTM D-1785 ; or Cellular Core Schedule  
40 DWV, ASTM F-891) , Schedule 40 CPVC (ASTM F-411), or ABS 
(ASTM D-2661) pipe. The fittings, other than the TERMINATIONS 
should be equivalent to PVC-DWV fittings meeting ASTM D-2665 
(Use CPVC fittings, ASTM F-438 for CPVC pipe and ABS fittings, 
ASTM D-2661/3311 for ABS pipe. If CPVC or ABS pipe and fittings 
are used, then the proper cement must be used for all joints, including 
joining the pipe to the Termination  (PVC Material). PVC Materials 
should use ASTM D-2564 Grade Cement; CPVC Materials should 
use ASTM F-493 Grade Cement and ; ABS Materials should use 
ASTM D-2235 Grade Cement. 
NOTE:    for  Water  Heaters  in  locations  with  high  ambient 
temperatures (above 100°F or 38°C) and/or insufficient dilution air, 
it is recommended that CPVC or ABS pipe and fittings (MUST USE 
SUPPLIED VENT TERMINAL) be used.
5.  It is important that condensate not be allowed to buildup in the 
exhaust vent pipe. To prevent this from happening the pipe should 
be installed with a slight, 1/8 inch (3mm) per 5 feet (152 cm) of 
pipe maximum downward slope.
6.  The vent system should be supported every 5 feet (152 cm) of 
vertical run and every 3 feet (91cm) of horizontal run of vent pipe 
length.
NOTE:  Stress levels in the pipe and fittings can be significantly 
increased by improper installation. If rigid pipe clamps are used to 
hold the pipe in place, or if the pipe cannot move freely through a 
wall penetration, the pipe may be directly stressed, or high thermal 
stresses may be formed when the pipe heats up and expands. Install 
accordingly to minimize such stresses.
FIGURE 12.
 
Number 
                      4" PVC 
 
 
 
of 90° 
Maximum 
Maximum 
 
Elbows 
Feet. of Pipe  
Meters of Pipe
 
ONE (1) 
65' 
19.7 m
 
TWO (2) 
60' 
18.2 m
 
THREE (3) 
55' 
16.7 m
 
FOUR (4) 
50' 
15.2 m
 
FIVE (5) 
45' 
13.6 m
 
SIX (6) 
40' 
12.1 m
OUTLET VIEW