Дополнительное Руководство для Hoshizaki fh1-ssb

Скачать
Страница из 63
11
POWER ON
Board Self Check
Display reads "r_##"
(## is board revision)
1. Frame heaters on
. Evaporator fan on
2.5 minute delay
1. Compressor start-up
. Condenser fan start-up
Cycle Off (Cut-out 
temperature reached) 
[Minimum .5 minutes]
1. Compressor off
. Condenser fan off
Cycle On (Cut-on 
temperature reached) 
[Minimum .5 minutes]
1. Compressor on
. Condenser fan on
If evaporator temperature
reaches 13°F (8°F for Pass Thru), 
unit initiates defrost. 
1. Compressor off
(Note: Condenser fan and
      evaporator fan are on.)
Evaporator temperature 
reaches 40°F, defrost 
terminated
1. Compressor on
. Condenser fan on
Normal cycling continues
Note: The start circuit of the compressor is timed such that at power-up and during 
any compressor off time, there will be at least a  1/ minute delay before the 
compressor will start. The only exception is when the overload activates and 
deactivates. The compressor has a  1/ minute minimum run time during every 
run cycle.  
II. General Information
A. Sequence of Operation and Timing Charts
1. Refrigerator and Refrigerator Side of Dual Temp Models
a) Sequence of Operation