Руководство Пользователя для Advantek Networks adr-18cu

Скачать
Страница из 55
ADSL Full-Rated Router    44
6.11 Diagnostic Test
The 
Diagnostic Test page shows the test results for the connectivity of the physical layer and 
protocol layer for both LAN and WAN sides.
Testing Ethernet LAN Connection: This test checks the Ethernet LAN interface connection.
Testing ADSL Synchronization: This test checks the ADSL showtime. If this test returns FAIL, all other 
tests will be skipped.
Test ATM OAM Segment Loop Back: This test sends ATM OAM F5 Segment loop back request cells to 
the CO. This test will pass if response cell is received.  Since some service providers might not support 
this test, it could still work even if this test fails.  If this test fails consistently and the ADSL router seems 
not working, make sure the VPI and VCI are configured correctly.
Test Ethernet Connect to ATM: This test checks the ATM AAL5 module is loaded correctly.
Test PPPoE Connection: This test checks the PPPOE connection.
Test PPP Layer Connection: This test checks the PPP authentication.
Test IP Connect to PPP: This test checks a valid IP address assigned from the service provider.
Ping Primary DNS: This test checks the primary DNS can be reached through ping request.
Query DNS for 
www.conexant.com
: This test checks the host name can be resolved to IP address though 
domain name servers.
Ping 
www.conexant.com
 : This test checks the specified host can be reached through ping request.