Справочное Руководство для projectiondesign action three

Скачать
Страница из 5
p r o j e c t i o n d e s i g n   C o l o u r   W h e e l   O p t i o n s   –  
p a g e   
W H I T E P A P E R
Black------
Grey------
White------
Silver-------
Black------
Grey------
White------
Silver-------
Black------
Grey------
White------
Silver-------
Black------
Grey------
White------
Silver-------
projectiondesign unique Colour Wheel Options
All projectiondesign professional F-series projectors have the option of user 
specified colour wheels options, to perfectly match application requirements.
DLP™ technology creates projected images by presenting colours in a 
sequential format, using the primary colours red, green, and blue to create 
and reproduce any computer or video generated colour or combination of 
colours. Sequential colour display works by displaying only one single colour 
at the time, for very short periods, so that the eye and brain interprets the 
resulting image as a full colour one. Switching between the primary colours, 
thus creating full colour images, happens incredibly fast, imperceptible to the 
human eye.
By giving the user or integrator the option to specify colour wheels, 
projectors can be tailored to specific requirements and applications, 
such as pure black and white imaging, wide colour gamut simulation and 
visualization, general graphics display, medical imaging, and so forth.
Each colour wheel option gives slightly different performance characteristics, 
enabling a perfect match to the desired applcation.
What are the options?
Each model has slightly different options, depending on their specification 
and construction. There are, however, certain options that can fill or fit the 
same requirements, even though the actual colour wheel is different. There 
are three main categories:
High Brightness
General Graphics Display
Visualization and Simulation
Obviously, colour wheels that fit into these three categories can also be used 
for other applications. More applications in general, and their anticipated 
requirements, are listed below.